Archive for the ‘Elimination Processes’ Category

Elimination Processes

August 16, 2009

Elimination of probable causes had to be done at processes of 1. Design 2. Construction and 3. Operation and maintenence.
The design had to comply with all the requirements of certain specified code of practices. The output from Structural Design Processes were translated into drawings and specifications.
During construction processes System must be established to enusre the construction will be done in accordance with the drawings and specification. Processes in these System includes materials acceptance, quality control, verification and validation and records management.
During Operation and Maintenance the owner must ensure the usage of the facilities comply with the intended purpose and design.

Deterministic\Probabilistic Design

Probabilistic DesignProbabilistic Design

Deterministic Design

Deterministic Design

Fig 1a Structural Integrity

Advertisements